Steel Formwork

Maze This is the dream of Guido Faresin, who since 1973 has chosen to change the construction sector, bringing spark and innovation to a static and saturated market. The headquarters in Breganze is both the bond with the roots and nerve centre of Italian and international mechanical engineering, fertile ground for an entrepreneurial undertaking with its sights set on the future.

Maze advantages

Here, Guido has shared with his team the energy and drive for change leading to the many successes over the years. Without ever forgetting the value of roots, he has conveyed the ability to look ahead, focus on exploration and the ceaseless drive towards technological , professional,

EDAIF Building – Ghana

A 16-story government office building located in Accra, Ghana.
The building was built by the construction company Amandi in 2017 and includes 23,000 square meters.

The construction process included the use of SBA Rummy formwork system, Eitan Steel formwork system and special costume formworks for decorative walls.

Skip to content